All our work force have extensive training and experience along with relevant accreditations specific to their role on site
CFA (Continuous Flight Auger) piles, auger cast piles or screw piles, are the piles first introduced in the UK in the 1960s, and due to their advanced features, their adoption in the current construction industry is going at a swift pace. They are used in Essex for several sizes of buildings to provide a solid and deep foundation.
Alpha Piling LTD is recognised as one of the leading CFA piling contractors in Essex. Our experienced team of licenced and certified engineers is dedicated to providing the highest-quality CFA pile constructions in Essex.
The process of CFA piling utilises a cutting-edge technique. This technique combines the process of driven piles and bored piles to deliver an efficient process. We follow the process below for the construction of CFA piles.
Step 1: Get in touch with our experienced groundwork contractors to discuss your project in detail and finalise your requirements.
Step 2: Our advanced augers will arrive at your location on the scheduled date. Our specialists will start the preparation of ground for mini piling foundations and will select the places for drilling.
Step 3: Once the ground is ready after the necessary preparations, drilling into the ground will start with a continuous flight auger.
Step 4: After reaching the required depth, the auger will be removed, and our contractors will start pumping concrete through the hollow shaft of the auger pipe. It will fill the void and create a CFA pile that is both strong and reliable.
Step 5: Our skilled engineers will utilise advanced equipment to ensure the pile strength and capacity, after it is constructed with precision and left to cure for appropriate time.
Our CFA piling contractors in Essex are skilled in constructing efficient CFA piles that come with numerous benefits:
Contact us for your next CFA piling project in Essex and experience the difference with our certified contractors. Our licenced engineers are here to assist you throughout your groundwork needs and create a sturdy foundation for your building with the ability to last longer.
The diameter of CFA piles ranges between 300mm and 1500mm, depending on the ground condition and size of the building to be constructed.
The average depth for the practical CFA pile construction is calculated to be between 18m and 32m.
The load capacity of CFA piles depends on the size of the constructed pile and ground conditions. However, the average capacity is calculated to be between 40 to 150 tons.
The minimum space that is required for the construction of CFA piles near the already installed structure is between 5 to 8 pile diameters.
Building 18, Gateway 1000, Whittle Way, Arlington Business Park, Stevenage, Hertfordshire, SG1 2FP
Email: enquiries@alphapiling.co.uk
Tel: 01245 408742
Monday – Friday: 7:00am-6:00pm
Saturday-Sunday: Closed
Copyright © 2024 | Alpha Piling Ltd | All rights reserved.