Continuous Flight Auger (CFA) piling was first introduced back in the 1960s. With time, it has revolutionised the realm of foundation constructions.
At Alpha Piling, we provide expert CFA piling in Colchester. Equipped with a team of experienced and certified engineers, we are dedicated to delivering excellence in every mini piling foundation project we undertake.
CFA piling follows a sequential process to create a stable foundation. Below is the step-by-step process that our company follows to ensure efficiency:
Step 1: The first step is to prepare the site for constructing CFA piles; it can be done by clearing the obstacles involved and ensuring our advanced machinery and equipment access to the site.
Step 2: Our CFA piling rig is brought to the site and placed in the required position. Its stability and safety measures are determined and implemented accurately.
Step 3: The drilling process is started by our licenced groundwork contractors with the continuous flight auger. The auger rotates and drills into the soil parallelly, reaching the required depth. As the auger drills down, soil cuttings are brought back to the surface, and concrete is continuously pumped through the shaft to provide stability.
Step 4: Once the borehole is filled with concrete, our specialists remove the auger from the ground carefully to prevent any disruption to the freshly poured concrete.
Step 5: Reinforcement cages are inserted into the fresh concrete for additional strength and stability to the pile, depending on the design of the structure above the foundations.
Step 6: The top of the newly constructed pile is levelled and covered for protection and to provide a durable foundation for the construction to be done above it.
Step 7: The last step is the testing of piles for load-bearing capacity, performed by our specialists to ensure that the pile is constructed according to the required standards and specifications.
When it comes to piling for your construction project, choosing the right contractors is vital. Below are some reasons that will put us on top of your list when hiring CFA piling contractors in Colchester:
Let’s take your construction project to the next level with Alpha Piling, an experienced CFA piling contractor in Colchester. With our paramount commitment to excellence and customer satisfaction, you can always trust us for unparalleled results.
The average diameter of CFA is between 300mm to 900mm.
CFA piling does not come under mini piling, although both methods are used to create solid foundations. They differ when it comes to equipment size, applications and drilling techniques. In most cases, mini piling is used where there is limited access and low headroom for CFA piling to work efficiently.
Some of the advantages of CFA piling are:
CFA piles can reach an average depth of over 35mm, which makes them practical for both residential and commercial projects.
Building 18, Gateway 1000, Whittle Way, Arlington Business Park, Stevenage, Hertfordshire, SG1 2FP
Email: enquiries@alphapiling.co.uk
Tel: 01245 408742
Monday – Friday: 7:00am-6:00pm
Saturday-Sunday: Closed
Copyright © 2024 | Alpha Piling Ltd | All rights reserved.